Furnas Dam
Furnas Dam, c.390 ft (120 m) high, at the junction of the Rio Grande and Sapucaí rivers, SE Brazil, in Minas Gerais state; completed 1962.
It has a 620-sq mi (1,606-sq km) reservoir. It includes large hydroelectric facilities and is the center of an extensive regional electrical grid serving the industrial centers of São Paulo, Rio de Janeiro, and Belo Horizonte.
Dutchclamp has been awarded this order from ABB.