Gecertificeerd ISO 9001:2015
Kwaliteit: naast flexibiliteit en klantvriendelijkheid een belangrijk gegeven. Kwaliteit staat bij ons hoog in het vaandel en wij doen er alles aan om deze te waarborgen. ISO 9001 is daarbij een belangrijk instrument. lees verder
The Hong Kong–Zhuhai–Macau Bridge
The Hong Kong–Zhuhai–Macau Bridge is a construction project which consists of a series of bridges and tunnels crossing the Lingdingyang channel that will connect Hong Kong, Macau and Zhuhai, three major cities on the Pearl River Delta in China. lees verder
Hebron GBS Project Canada
The Hebron oil field is located offshore Newfoundland and Labrador in the Jeanne d'Arc Basin 350 kilometres southeast of St. John's. lees verder
The Katharina UGS facility
Peißen bei Bernburg Germany, is a joint venture established on a par by Gazprom and VNG. lees verder
Google Data Centre Finland
Internet giant Google has opened its new data centre in the south-eastern town of Hamina on the Baltic Sea coast. lees verder
Furnas Dam
Furnas Dam, c.390 ft (120 m) high, at the junction of the Rio Grande and Sapucaí rivers, SE Brazil, in Minas Gerais state; completed 1962. lees verder
Gemini Offshore windpark
Het Gemini Offshore windpark zal één van de grootste windparken ter wereld worden, qua formaat en capaciteit. Het wordt gebouwd in het Nederlandse deel van de Noordzee, 85 km ten noorden van Groningen, een locatie niet zichtbaar vanaf het land, met een sterke en constante wind. lees verder
Projecten, een klein wereldwijd kijkje achter de schermen bij Dutchclamp.
Ampang line - Terminal 2 London heathrow - Sochi winterspelen / Autodrom - Cern deeltjesversneller - Macarthur Wind Farm lees verder
Verbluffende resultaten
KEMA / DNV-GL lees verder